Shipment Method: Self Pick-Up or Ground Transportation (by 3rd party) Payment Method: Local Cheque Deposit (CD) or Local Bank Transfer (TT) Delivery Time: 3 Working Days after successful payment made
YCELL Capacity in BD-Load = 1*2,700 = 2,700kN YJACK Capacity in BD-Load = 8*2,700 = 21,600kN YJACK Test Range in BD-Load = 0 to 21,600kN
Tremie Hole = 700mm Loading Area = 37.6% Concrete Cover = 75mm
Fabrication Method: DIY by Welder, Competency Level L1 (do it yourself) Installation Method: DIY by Installer, Competency Level L2 (do it yourself) Testing Method: DIY by Tester, Competency Level L2 (do it yourself)
Hydraulic Hoses: included (length = pile top to balance level + 5m) Telltale Wires: included (length = pile top to balance level + 5m) Grouting Pipes: sonic logging pipes or poly pipes by contractor
YCELL Capacity in BD = 1*2,700 = 2,700kNYJACK Capacity in BD = 8*2,700 = 21,600kN0 < Applied Load (BD) <= 21,600
8*4GYJ2D325Tremie Hole = 700mmLoading Area = 37.6%Orbit Radius = 601.69mm