BP1200Ø_5*4GYJ2D325s (16,500kN)

Shipment Method: Self Pick-Up or Ground Transportation (by 3rd party)
Payment Method: Local Cheque Deposit (CD) or Local Bank Transfer (TT)
Delivery Time: 3 Working Days after successful payment made


YCELL Capacity in BD-Load = 1*3,300 = 3,300kN
YJACK Capacity in BD-Load = 5*3,300 = 16,500kN
YJACK Test Range in BD-Load = 0 to 16,500kN


Tremie Hole = 400mm
Loading Area = 36.7%
Concrete Cover = 75mm


Fabrication Method: DIY by Welder, Competency Level L1 (do it yourself)
Installation Method: DIY by Installer, Competency Level L2 (do it yourself)
Testing Method: DIY by Tester, Competency Level L2 (do it yourself)


Hydraulic Hoses: included (length = pile top to balance level + 5m)
Telltale Wires: included (length = pile top to balance level + 5m)
Grouting Pipes: sonic logging pipes or poly pipes by contractor

RM36,300.00