Ecommerce

Bored Pile BP1350mm

View as Grid List
Sort by
Display per page

BP1350Ø_6*4GYJ2D325 (16,200kN)

Shipment Method: Self Pick-Up or Ground Transportation (by 3rd party)
Payment Method: Local Cheque Deposit (CD) or Local Bank Transfer (TT)
Delivery Time: 3 Working Days after successful payment made


YCELL Capacity in BD-Load = 1*2,700 = 2,700kN
YJACK Capacity in BD-Load = 6*2,700 = 16,200kN
YJACK Test Range in BD-Load = 0 to 16,200kN


Tremie Hole = 550mm
Loading Area = 34.8%
Concrete Cover = 75mm


Fabrication Method: DIY by Welder, Competency Level L1 (do it yourself)
Installation Method: DIY by Installer, Competency Level L2 (do it yourself)
Testing Method: DIY by Tester, Competency Level L2 (do it yourself)


Hydraulic Hoses: included (length = pile top to balance level + 5m)
Telltale Wires: included (length = pile top to balance level + 5m)
Grouting Pipes: sonic logging pipes or poly pipes by contractor

RM35,640.00

BP1350Ø_6*4GYJ2D325s (19,800kN)

Shipment Method: Self Pick-Up or Ground Transportation (by 3rd party)
Payment Method: Local Cheque Deposit (CD) or Local Bank Transfer (TT)
Delivery Time: 3 Working Days after successful payment made


YCELL Capacity in BD-Load = 1*3,300 = 3,300kN
YJACK Capacity in BD-Load = 6*3,300 = 19,800kN
YJACK Test Range in BD-Load = 0 to 19,800kN


Tremie Hole = 550mm
Loading Area = 34.8%
Concrete Cover = 75mm


Fabrication Method: DIY by Welder, Competency Level L1 (do it yourself)
Installation Method: DIY by Installer, Competency Level L2 (do it yourself)
Testing Method: DIY by Tester, Competency Level L2 (do it yourself)


Hydraulic Hoses: included (length = pile top to balance level + 5m)
Telltale Wires: included (length = pile top to balance level + 5m)
Grouting Pipes: sonic logging pipes or poly pipes by contractor

RM43,560.00

BP1350Ø_6*4GYJ3D325 (24,000kN)

Shipment Method: Self Pick-Up or Ground Transportation (by 3rd party)
Payment Method: Local Cheque Deposit (CD) or Local Bank Transfer (TT)
Delivery Time: 3 Working Days after successful payment made


YCELL Capacity in BD-Load = 1*4,000 = 4,000kN
YJACK Capacity in BD-Load = 6*4,000 = 24,000kN
YJACK Test Range in BD-Load = 0 to 24,000kN


Tremie Hole = 550mm
Loading Area = 34.8%
Concrete Cover = 75mm


Fabrication Method: DIY by Welder, Competency Level L1 (do it yourself)
Installation Method: DIY by Installer, Competency Level L2 (do it yourself)
Testing Method: DIY by Tester, Competency Level L2 (do it yourself)


Hydraulic Hoses: included (length = pile top to balance level + 5m)
Telltale Wires: included (length = pile top to balance level + 5m)
Grouting Pipes: sonic logging pipes or poly pipes by contractor

RM52,800.00

BP1350Ø_6*4GYJ4D325 (28,800kN)

Shipment Method: Self Pick-Up or Ground Transportation (by 3rd party)
Payment Method: Local Cheque Deposit (CD) or Local Bank Transfer (TT)
Delivery Time: 3 Working Days after successful payment made


YCELL Capacity in BD-Load = 1*4,800 = 4,800kN
YJACK Capacity in BD-Load = 6*4,800 = 28,800kN
YJACK Test Range in BD-Load = 0 to 28,800kN


Tremie Hole = 550mm
Loading Area = 34.8%
Concrete Cover = 75mm


Fabrication Method: DIY by Welder, Competency Level L1 (do it yourself)
Installation Method: DIY by Installer, Competency Level L2 (do it yourself)
Testing Method: DIY by Tester, Competency Level L2 (do it yourself)


Hydraulic Hoses: included (length = pile top to balance level + 5m)
Telltale Wires: included (length = pile top to balance level + 5m)
Grouting Pipes: sonic logging pipes or poly pipes by contractor

RM63,360.00

BP1350Ø_6*4GYJ5D340 (37,200kN)

Shipment Method: Self Pick-Up or Ground Transportation (by 3rd party)
Payment Method: Local Cheque Deposit (CD) or Local Bank Transfer (TT)
Delivery Time: 3 Working Days after successful payment made


YCELL Capacity in BD-Load = 1*6,200 = 6,200kN
YJACK Capacity in BD-Load = 6*6,200 = 37,200kN
YJACK Test Range in BD-Load = 0 to 37,200kN


Tremie Hole = 430mm
Loading Area = 38.1%
Concrete Cover = 75mm


Fabrication Method: DIY by Welder, Competency Level L1 (do it yourself)
Installation Method: DIY by Installer, Competency Level L2 (do it yourself)
Testing Method: DIY by Tester, Competency Level L2 (do it yourself)


Hydraulic Hoses: included (length = pile top to balance level + 5m)
Telltale Wires: included (length = pile top to balance level + 5m)
Grouting Pipes: sonic logging pipes or poly pipes by contractor

RM81,840.00

BP1350Ø_7*4GYJ2D325 (18,900kN)

Shipment Method: Self Pick-Up or Ground Transportation (by 3rd party)
Payment Method: Local Cheque Deposit (CD) or Local Bank Transfer (TT)
Delivery Time: 3 Working Days after successful payment made


YCELL Capacity in BD-Load = 1*2,700 = 2,700kN
YJACK Capacity in BD-Load = 7*2,700 = 18,900kN
YJACK Test Range in BD-Load = 0 to 18,900kN


Tremie Hole = 550mm
Loading Area = 40.6%
Concrete Cover = 75mm


Fabrication Method: DIY by Welder, Competency Level L1 (do it yourself)
Installation Method: DIY by Installer, Competency Level L2 (do it yourself)
Testing Method: DIY by Tester, Competency Level L2 (do it yourself)


Hydraulic Hoses: included (length = pile top to balance level + 5m)
Telltale Wires: included (length = pile top to balance level + 5m)
Grouting Pipes: sonic logging pipes or poly pipes by contractor

RM41,580.00