Shipment Method: Self Pick-Up or Ground Transportation (by 3rd party)
 Payment Method: Local Cheque Deposit (CD) or Local Bank Transfer (TT)
 Delivery Time: 3 Working Days after successful payment made
YCELL Capacity in BD-Load = 4*6,700 = 26,800kN
 YJACK Capacity in BD-Load = 4*13,400 = 53,600kN
 YJACK Test Range in BD-Load = 0 to 53,600kN
Tremie Hole = 600mm
 Loading Area = 32.1%
 Concrete Cover = 75mm
Fabrication Method: DIY by Welder, Competency Level L1 (do it yourself)
 Installation Method: DIY by Installer, Competency Level L2 (do it yourself)
 Testing Method: DIY by Tester, Competency Level L2 (do it yourself)
Hydraulic Hoses: included (length = pile top to balance level + 5m)
 Telltale Wires: included (length = pile top to balance level + 5m)
 Grouting Pipes: sonic logging pipes or poly pipes by contractor