Hiley-YLOAD

Act as alternative to the Hiley Formula which is mainly to measure the ram stroke by considering many factors including pile and hammer factors.

All users that have been given permission can prepare or edit the YLOAD sheet accordingly. Track all the status for the YLOAD sheet that been prepared.

YLOAD can be use to calculate PDA ram stroke for all grades of pile and all types of pile ranging from micropile to bored pile.
Old price: RM899.00
RM499.00